Stuart Park Primary School

HCS Constructions NT was appointed to design and construct a modern playground for Stuart Park Primary School. The project involved comprehensive site preparation, demolition and removal of existing play equipment, and installation of new play structures. The new playground features a sand play surface, providing a safe and engaging environment for students. Throughout the project, […]

Litchfield Council

HCS proudly delivered a new Accessible BBQ Shelter for Litchfield Council at Mira Square, creating a welcoming and inclusive space for the community to gather and enjoy. Designed and built with accessibility, the shelter features a DDA-compliant picnic table and an accessible electric BBQ, ensuring that people of all abilities can participate in outdoor activities […]

Leanyer Water Park

The Leanyer Recreation Park project included structural remediation to address corrosion and deterioration of steel and concrete components within the waterpark facilities, utilising rope access for efficient and low-impact delivery. Key tasks covered the removal of corrosion, repairs to elevated steelwork, preparation of surfaces, and application of high-performance protective coatings to extend service life and […]

Palmerston Swell

HCS successfully completed works for the City of Palmerston, delivering the construction of a new shade structure covering 12 carpark bays at SWELL (Palmerston Swimming Pool). The project was delivered on time and with no disruption to public access or facility operations, ensuring the community could continue to enjoy the pool throughout the works. The […]

Howard Park Reserve

Through inspections at Howard Park Reserve, Skate Park, it had become evident that existing soft fall rubber on the mounds required replacement of a more durable and sustainable product. This project involved the removal and ethical disposal of the existing soft fall on the mounds, earthworks relating to the forming of the mounds and then […]

Millner Primary School

HCS Constructions NT was engaged to design and construct a modern playground for Millner Primary School. The project involved comprehensive site preparation, demolition and removal of old play equipment, and installation of new play structures, including a Ninja Course and a Large Cube additionally, the project featured the installation of EPDM rubber softfall. “The installation […]

Woodroffe Primary School

The purpose of this project was to enhance the safety, functionality, and aesthetic appeal of the preschool playground at Woodroffe Primary School. This project involved the removal of outdated equipment and materials, installation of new features, and improvements to water drainage systems. This comprehensive renovation project created a safer, more enjoyable environment for the children […]

Litchfield Council

The primary goal of the Litchfield Council Roof Restoration project was to ensure the structuralintegrity, longevity, and energy efficiency of the council office building by restoring the roofto optimal condition. This restoration aimed to address existing damage, enhanceweatherproofing capabilities, improve energy efficiency, and align with the NationalConstruction Code standards. “I am writing this testimonial to […]

Farrar Early Learning Centre

Our recent collaboration with the Department of Infrastructure, Planning and Logistics involved rectification works to an outdoor play area at Farrar Early Learning Centre, including raising the earth with topsoil to ensure proper drainage to existing concrete swale drains. Additionally, we supplied and installed composite decking boards to create a durable foundation against concrete slabs. […]